Types of Drilling Methods
Earlier drilling of aquifers for personal use was carried out mainly by manual means. It was a time-consuming and lengthy process, so not every owner of the site or cottage could boast of having its own source of water supply.
Gradually, mechanized drilling displaced manual methods due to the significant facilitation and acceleration of the process.
Today, almost all aquifers are drilled in a mechanized way, which is based on the destruction of the soil, feeding it to the surface in one of two ways: dry, when the waste soil is removed from the well using mechanisms and hydraulic, when it is washed out by water supplied under pressure or by gravity.
There are three main methods of mechanical drilling:
- Rotational (soil is developed by rotation).
- Shock (bursnaryad destroys the ground with blows).
- Vibrating (soil is developed by high-frequency oscillations).
The rotational method is considered the most high-performance, 3-5 times higher in efficiency than the shock and 5-10 vibrational. In addition, the rotational method is the most inexpensive and affordable, it is often used as the main method of manual drilling.
Mechanical rotational methods of water well drilling replaced the inefficient manual methods
In turn, the rotational drilling method, widely used for constructing water wells, is divided into four main types of drilling:
- core;
- auger;
- shock-rope;
- rotary.
Each type of rotary drilling has its own characteristics and is performed by equipment specially designed for this. Consider these types of drilling in more detail, determine what their differences are and what method must be applied in each case.
The specifics of core drilling
Core drilling is a mechanical rotational method in which clay or dense sandy soil is extracted in the form of a cylindrical core. The core drill is a thick-walled metal pipe.
At the top of the core drill is a device for attaching the rods necessary for building the drill string. Below is a crown, the type of which is selected depending on the category of soil to be drilled.
Image Gallery
Photo from
The essence of core technology
Capture of destroyed soil
Ground drill release
Core drilling soil
When driving through the column method, the soil is destroyed by an annular crown. In this case, the core core remains intact. To facilitate the drilling process on hard and semi-solid loam, clay, rock, flushing fluid is supplied to the face.
During core drilling, the soil is not destroyed, but is “drilled” by the crown and captured by the core pipe. The drilled rock is extracted to the surface in the form of a core - a monolithic cylindrical column of rock
Sludge from the bottom is sometimes removed by washing - pumping a large amount of water into the barrel. Most often, flushing is replaced by purging with compressed air supplied by the compressor into the pipe. This type of drilling allows you to drill wells up to 1000 meters deep and with a diameter of 8 to 20 cm.
Mechanical core drilling is carried out by drilling rigs of the ZIF, UGB, UKB type, mounted on KAMAZ, KRAZ-type cars, skidders, etc. In the embodiment for manual drilling, the core tube is shortened, called a bell or a glass. With the last household item turned upside down, the core tube is structurally similar.
Core drilling is used in the following cases:
- mineral exploration;
- exploratory well drilling;
- arrangement of aquifers of any depth, including filterless wells in rock formations.
For the installation of private wells for water in some cases, the core method is used before starting auger or rotary drilling, performing both the exploratory and preparatory role.
In the design of private wells, core drilling is used in combination with shock-rope. Clay layers pass through a core pipe. Loose sands, gravel and pebble with sand aggregate that do not linger in the core tube are removed from the barrel by zheloning.
By efficiency, the core method is slightly inferior to the screw method of drilling water wells. They drill auger faster, but it does not allow to completely free the trunk from the drilled rock. They are rarely used in pairs. And if it is given, then the first few meters pass with a screw.
Crowns do not destroy the soil, but carefully cut it around the perimeter, forming “columns” - cores, studying which you can make a hydrological section of the site
Used equipment and tools
The following tools are used for core drilling:
- drill bits made of diamond or other carbide material (steel, tungsten, win);
- core pipe;
- pipe for removal of sludge;
- rods required to build the drill string;
- coupling joints, adapters between pipes, flushing seal.
When drilling in rocks, the drill bit wears out quickly and needs to be replaced. The material of the crown is expensive, withstanding enormous loads, the most widely used diamond drilling options.
All tools used in the drilling process must be aligned, i.e. located exactly relative to the axis of drilling.
Core drilling technology
The main feature of core drilling is the passage of the rock with its full preservation in the core pipe. Those. during the operation of drilling equipment, the crown on the ring destroys the soil, which, as it goes deeper, is pushed into the core pipe and held in it due to its own density.
When removing the filled pipe from the working shaft, it is freed from the core by tapping with a sledgehammer.
The phased core drilling process is as follows:
- the drill bit is connected to the core pipe;
- the core pipe is connected to the rods, which grow as they deepen;
- the upper bar is fixed in the drilling rig;
- the drill rotates the drill string and gradually “screw” it into the ground;
- core pipe is gradually filled with core - jammed soil in its cavity;
- after driving 50 - 70 cm, the drill string is removed to the surface, the rods are disconnected in turn until the core tube is removed;
- the pipe is freed from cuttings;
- the empty shell is again lowered to the face, increasing the drill string with rods.
The actions are performed in the described order until the well reveals the aquifer and dives 50 cm into the underlying waterproof rock.
If fixing the upper aquifer is not the purpose of sinking, then the upper layers can be drilled with flushing. In this case, the pump sells the flushing solution through the hose into the pipes. Then the solution carries the excavated soil to the surface.
If the purpose of the well’s arrangement is not an aquifer in the sand, drilling can be flushed before reaching the rock
Good strengths and weaknesses
Compared to the shock-rope and rotary methods of mechanical drilling, core drilling is performed quite quickly, significantly reducing the time of work. Its main drawback is the impossibility of lifting loose soils and pebbles saturated with water. Slowly moving along the rocks, a bit is required to drive the boulders.
The advantages of core drilling include:
- high productivity and the ability to drill wells with a depth of over 100 m;
- reduction of loads on drilling equipment due to the destruction of clay, comparable to its cutting;
- the possibility of using a mobile drilling rig of compact dimensions.
Core drilling is one of the fastest methods for developing water intake workings. A well on the sand with its application can be completed in one working day. Manually developed water intake will take much more time.
Features of auger drilling
This type of drilling is most often used today in the construction of aquifers in private farms. A feature of auger drilling is that the developed rock is completely removed from the borehole without involving additional equipment. The method resembles screwing, allows you to drill to a depth and at the same time remove unnecessary soil.
The tool used for drilling is called auger. It is a metal rod with blades. Screwing into the ground, the auger destroys the rock, which lingers on its blades. Due to the specific design of the screw, it is impossible to completely free the face from the blade. Therefore, it is mainly used for driving the upper layers.
Auger drilling is a quick and inexpensive method that does not require a flushing fluid reservoir
Drilling using a screw does not require much effort and financial costs, so the scope of this method is wide enough: exploration wells, laying of communications, construction of bored wells and partially drilling for water.
It is now actively used for the construction of Abyssinian wells, so as not to completely plug the needle-hole into dense soil, but to slightly facilitate the process of immersing the trunk in a previously destroyed rock.
The method is suitable for the development of aquifers with a depth of up to 30 m on soft and loose soils and up to 20 m on medium-dense. After auger penetration and installation of a casing, the wellbore must be cleaned by the bunker of unexcited rock.
The auger is categorically not suitable for work in rocks! It is used for partial drilling of wells up to 120 m, while this method is combined with others: rotary, shock-rope, core.
Image Gallery
Photo from
The principle of auger drilling method
Manual Drilling Mechanization
Disadvantages of Auger Drilling
Equipment and tools involved
Auger drilling is performed by a drilling rig, the main element of which is a screw type drilling tool made of high strength metal. Drill string as deepening build up screws of equal size.
In the kit, sometimes used blade bits necessary for the passage of loose rocks, as well as bits with round or conical heads, used for the development of hard rocks.
A drilling rig based on a car equipped with a powerful engine is the best option for drilling in remote and inaccessible places
Most modern drilling rigs are equipped with hollow shells equipped with reversible locks that prevent the tool from moving in the opposite direction.
The cutting parts of the auger during drilling are cooled by the developed soil, and the developed rock rises up in spirals. This allows you to drill without stopping, significantly reducing the time and energy costs of creating an aquifer.
Auger drilling technology
After completion of the penetration, the depth of which is 1.5 - 2.0 m, the auger is removed and casing pipes are installed in the well. The diameter of a water well drilled with a screw is 50 - 200 mm and depends on the size of the tool used.
Collapse of the walls of the borehole prevent casing. This is especially important for loose, incoherent soils, so drillers have a rule: to use augers with blades at an angle of 30 - 60º when driving sandy loams and loams, and when drilling sand of tight compaction, a tool with blades at an angle of 90º.
With a smaller slope of the turns of the auger spiral, more than a disconnected blade brings the auger to the surface.
Auger drilling does not require the use of flushing fluid, the rock developed with the help of a chisel is brought to the surface on the tool blades
Pros and cons of using a screw
The auger method of drilling allows the well to be constructed as quickly as possible, provided that the size of the auger and the angle of inclination of the bit were selected correctly.
The advantages of auger drilling include:
- soil rises to the surface immediately during drilling;
- high speed of deepening into the ground without technological stops;
- there is no need to flush the wellbore;
- a compact auger rig or a hand auger can be drilled inside the house (in the basement);
- there is no need to raise the first link to the surface and disassemble / assemble the drill string as in the core method.
The main disadvantage of auger drilling is the impossibility of working on loose and very hard soils, but at the same time, the auger is an ideal tool for drilling in loamy, mixed (clay and sandy loam) and soft clay soils.
Another drawback that restricts the use of a screw for the construction of aquifers is the need to use a shock-rope method to clean the trunk of dumped rock.
The similarity of the screw - the coil is widely used in manual drilling. It also destroys the rock and grabs it with blades for extraction to the top.
Rotary Drilling Feature
Rotary drilling is a rotational-vibration drilling method in which the destruction of the soil is carried out using a bit driven in the bottom of the well from the rotor of the drilling rig. The rotor rotates from a car engine or a separately installed electric motor through a drive shaft.
The developed soil is washed out of the well shaft by direct or reverse flushing. Wash solution can be supplied either by gravity or by a pumping station.
Most artesian wells are drilled using the rotary drilling method: using a rotary rotary drill bit, followed by flushing the well and securing the casing
Rotary drilling is used to develop rocky and semi-rocky soils with the installation of deep wells up to 150 m.A rotary drilling rig with a correctly selected chisel and weighted drill pipes does an excellent job of rock formations.
Drillers recommend using this drilling method under the following conditions:
- The hydrogeological section of the site has been studied quite well. It is known that rocks are to be drilled. The level of occurrence of the aquifer in bedrock is known.
- Groundwater has a characteristic pressure for artesian wells
- There is the possibility of uninterrupted delivery of process water for flushing the well.
In the southern regions, rotary drilling can be carried out all year round, and in the northern climate the application of this method is limited due to the possibility of freezing of the flushing fluid.
Applied equipment and tools
Rotary drilling of aquifers is carried out using a frame or trellis tower, on which lifting equipment and other elements of the drilling rig are located. The tower makes it possible to raise and lower drill strings into the well.
The rotary type drilling rig includes:
- frame or trellis tower;
- motor with drive;
- rotor and drill string;
- pumping equipment and flushing fluid treatment system;
- lifting equipment, pressure line, swivel, oil seals, etc.
In self-propelled units, the engine of the vehicle is used as the engine, on the basis of which the drilling complex is located. In this case, the engine speed is regulated by the speed of the drilling tool.
A stationary or mobile electric motor, internal combustion engine of a car, generators can act as an energy source for a rotary drilling rig
The rotor with the help of a gear device transmits rotation to the lead pipe, which in turn communicates it to the main drilling tool - the chisel. The bit can have a different shape and is made of high-strength materials: composites, diamond-coated steel, etc.
For each type of soil, a special size and shape of the bit is selected, thereby ensuring high efficiency and penetration rate.
Image Gallery
Photo from
Manual Drilling Machine
Auger drilling technology
Drill string extension rods
Development of a drilled well
The peculiarity of rotary technology
Rotary drilling of wells for water is carried out in three stages:
- Rock breaking with a chisel.
- The removal of the destroyed rock to the surface by a stream of injected water.
- Strengthening the walls of the borehole with casing pipes.
The removal of the destroyed soil is carried out by reverse or direct washing. The choice of flushing method depends on specific conditions: well depth, type of soil, availability of the required volume of flushing water.
As a rule, private farms use direct flushing drilling technology, which includes the following steps:
- deepening of large diameter bits into the ground;
- bit rotation under the influence of a rotor;
- installation of drill pipes and installation of weighted pipes between them and the bit;
- removal of waste soil by fluid pressure using a pump;
- casing installation to prevent soil sprinkling inside the well;
- drilling with a bit with a smaller diameter and repeating the entire cycle.
When backwashing, the soil is removed from the well through the pipes of the drill string, and the flushing fluid is poured between the walls of the well and the pipes.
Water flows by gravity into a previously prepared reservoir, where it is cleaned of soil and sludge, and returns to the drill string for a new portion of the waste rock.
In some cases, when performing rotary drilling, not direct or reverse flushing is used, but air blowing under pressure created using a compressor
Advantages and disadvantages of rotary drilling
The main advantage of the rotary method is the ability to drill deep wells with water intake in fractured limestone.
In addition, this drilling method has the following advantages:
- high quality opening of a water carrier in bedrock;
- the ability to arrange large diameter wells up to 200 cm;
- high drilling speed, low energy costs.
A significant disadvantage of rotary drilling can be called the need to organize the flushing of the well.
Which drilling method to choose?
All the considered methods of mechanical drilling are widely used for the construction of aquifers.
Summing up, we can say that:
- Core drilling should be used for sinking in plastic clay soils. The core method is suitable for the construction of most water intake workings; if necessary, it is used in conjunction with a shock-rope.
- Auger drilling in application is similar to the core method. It differs from it by poor-quality cleaning of the barrel, requires the mandatory use of a bailer or long-term washing of the well before operation.
- Rotary drilling is the best option for punching wellbores in rocky soils.
The cost of developing a well using one or another drilling method largely depends on what equipment is used, as well as on the categories of rocks passed by drillability.
A well-chosen method of drilling a well will not only help reduce the time spent on drilling, but will also allow to operate the water source in the future without problems
You can read about how to make a drilling rig with your own hands in another popular article on our site.
Video # 1. Demonstration of the principle of classical core drilling with core extraction by water pressure:
Video # 2. Features of auger well drilling:
Video # 3. Core drilling of a well with washing the bottom and installing a double casing, the outer part of which is made of steel pipes, the inner polymer:
Drilling an aquifer is a time consuming process. Not only the speed of an autonomous water source device, but also the financial costs depend on the correctness of the chosen drilling method.
The first thing you should pay attention to when choosing a drilling method is the type of soil and the depth of the aquifer. Based on these parameters, you can choose the best option that will allow you to drill a well quickly and inexpensively.
Do you want to share the history of well drilling in your own area or useful information on the topic of the article? Please leave comments in the block below. Here you can ask a question or point out controversial points in the text.